GLOBAL DISTRIBUTOR RECRUITMENT | Integrated Parking & Charging | A Speedy Increasing Market, Shared with you

Warehouse Stack Four-post Parking System

四柱停车设备 2
Part name

1. Main Column 1 (with Installation

Plate)

2. Main Column 2

3. Auxiliary Column

4. Lower Main Runner Plate

5. Lower Auxiliary Runner Plate

6. Lower Rear Cross Beam

7. Lower Front Cross Beam

8. Lower Middle Clamping Plate

9. Upper Platform

10. Upper Runner Plate

11. Upper cross beam

12. Upper wheel guard plate

13. Upper middle clamping plate

14. Side pull rod:

15. Locking strip

16. Auxiliary column top cover

17. Main column top cover

18. Locking hook

19. Electrical box

20. Control box

21. Power unit

表格2
  • If the installation location is an entire concrete surface, then the thickness of the entire concrete surface shall be > 200 mm.
  • If the installation location is on non-concrete flooring, a foundation shall be constructed at the column installation site, with a grouted concrete layer thickness of >700 mm.
  • Newly cast foundation concrete must cure for at least 28 days.
  • The load-bearing capacity of the concrete is 210 kg/cm.
  • The ground surface must be level and free of cracks, with a flatness of <5 mm.
四柱停车设备 3

The power supply for a single piece of equipment shall be at least 3 kW, with a cable cross-sectional area of at least 2.5 mm 3.,and a grounding wire is required. For multiple pieces of equipment, the power supply shall provide at least 70% of the total power of all equipment, i.e., total power = (N x 3 kW) x 70%, where N =the total number of equipment units.

Control box:

The emergency stop switch can cut off the power supply to the equipment in case of an emergency. The lifting of each car platform can be controlled independently via a dedicated button.

Limit switch:

Limit the lifting height of the load platform.Ensure the equipment operates smoothly.

Ready to Solve Your Parking Challenges and Maximize Space?

Partner with JiuRoad to transform your limited land into a high-efficiency, automated parking hub. From top-level design to seamless installation, our engineering team is here to provide a complete one-stop solution. Share your site conditions with us today, and let us create a custom layout tailored specifically for you.

Submit An Inquiry

You will get touched within 1 work day.

Submit An Inquiry

You will get touched within 1 work day.

Submit An Inquiry

You will get touched within 1 work day.

Submit An Inquiry

You will get touched within 1 work day.

Submit An Inquiry

You will get touched within 1 work day.

Submit An Inquiry

You will get touched within 1 work day.

Submit An Inquiry

You will get touched within 1 work day.

Submit An Inquiry

You will get touched within 1 work day.